Constructing next-generation perovskite-compatible self-consumption solar power generation on the roof!
A change in the leading role of renewable energy. The root cause is dependence on imports, and the solution is "domestic production × perovskite."
Total construction cost of 908.4 billion yen, with 83 solar power plants built nationwide. Numerous major clients including Sharp, Panasonic, Daiwa House, Nomura Securities, and JA Mitsui Leasing. Achieved up to a 28% reduction in electricity costs without stopping high-precision manufacturing and logistics equipment. Simultaneously realized CO₂ reduction. 【Industry Challenges】 Supply risks and price fluctuations due to dependence on overseas panels. Burden of updating aging equipment and the emergence of waste panel issues. Rising electricity prices hinder business continuity planning (BCP). 【On-site Pain Points】 The structure of "renewable energy = reliance on overseas" threatens the stability of corporate electricity supply. Electricity prices have risen by about 38% over the past five years, and without reducing import dependence, the risks of power outages and price surges cannot be avoided. If the development of domestic technology lags, a future where the renewable energy market is dominated by overseas players awaits.
- Company:バリューイノベーションジャパン
- Price:Other